News & Events

Coca-Cola Beverages Pakistan Ltd. Faisalabad Plant

  • Structural Strengthening using Sika Material/ Strips.
  • Foundation Works of Washer, Carbo-Cooler, Filler Foundations, 40 Ton Tank Pad, RO Plant, Softening Unit, Caser & D-Caser, Ammonia Plant.
  • Tiling, GI Roofing, Tuff Pavers & Roof Treatment Works.
  • Drain Works for Processes Water, Sanitary Water, Storm Water.
  • Electrical Works

Hranmash Bulgaria

Services for Electrical & Mechanical Installations AlMaty Line at CCBPL Lahore

Engro Eximp Agri Products Muridke

  • Integrated Rice Processing Complex Project.
  • Process Area Lighting Project.
  • Main Mill Works.
  • Parboiling Plant Project.
  • Aging Ware House Project.
  • Electrical Works ESP,LP, Boiler and Auto bagging Project.

Miscellaneous

  • Colony Textile Mills 24MW.
  • Rupafil Polyester 6MW.
  • Rupali Polyester 9MW.
  • Indus Home 6MW.

Sinjhoro Development Project Sanghar

  • Installation, testing and commissioning of 3 x 965KW, 3-phase, 415 Volts, 50 Hz Gas Engine Driven Power Generators (PG-8001A, PG-8001B and PG-8001C)  complete with associated panels, Piping, Fabrication and interconnection cabling etc.
  • Synchronization, interlocking, testing and commissioning of complete power generation system.

500KV Switching Station & 500KV Substations

Erection, Testing & Commissioning Works at :

  •  500KV Switching Station at Moro.
  • 500KV Substation at Jamshoro(Extension)
  • 500KV Substation at Dadu(Extension)
  • 500KV Substation at RahimYarKhan(Extension)

Jamal Din Wali (JDW) Sugar Mills – Unit I

  • RCC Structures Upto + 9.0 M of Pre Juice Heater, Batch Pan, Clarifier
  • Bale Maker , Sugar Elevator, Radiator & Misc. Foundations
  • FFE Foundations & Supporting Structure up to + 22.65 M.
  • Juice Heater Structure Up to + 9.0 M

Chiniot Power Limited

  • Successful Commissioning of 2 x 31.2MW Cogeneration Power Plant
  • Successful energization of 132KV Switchyard (AIS) (Complete Erection, Testing & Commissioning)

Liberty Power Tech. Ltd. Faisalabad – 200MW Combined Cycle Power Project

  • 11 DG (Wartsila W18V46) + 11 WHEGB* +1 ST.
  • 132KV  Switchyard (AIS)
  • Civil Works
    • Construction of Drain, Epoxy Painting, Water Proofing Works.
    • Road Works (Main Road to Engine Hall for 450 Ton Load).
    • Construction of Boundary Wall.
    • Weight Foundations, LPTL Store Building, Office and Guard Room.
    • Switchyard Gravel Filling & Leveling.

100MW Zorlu Bahawalpur Solar power Plant

Civil, Electrical  Erection, Testing & Commissioning for 132/11KV
Switchyard .(Partially completed)

  • Foundation Works for 132/11KV Power Transformer
  • Foundation Works for 132KV AIS CB, CT & MCT
  • Foundation Works for 132KV AIS Surge Arrestor, VT
  • Civil Works for Earthing Transformer & Earth Mast Foundation
  • Construction of Fire Protection Wall
  • Construction of 132KV Switchyard Cable Trenches
  • Provision and Placing of Trench Covers

TP -1000 Project at KE

Erection, Testing & Commissioning Works of 132/11KV Substations.

  • LANDHI  132KV Extension Works
  • Karachi Export Processing Zone (KEPZ) 132KV Extension Works
  • RECP 132KV Extension Works

Pipri Grid Station

Erection,testing and Commissioning of  250 MVA Auto Transformer at Pipri Grid Station .

  • Installation, Testing, Dehydration & Commissioning of 250MVA Auto Transformer at Pipri Grid Station
  • Sergi System Local parts (Supply & Installation)

Chanar Energy Limited

22 MW CO-GENERATION POWER PROJECT–Chanar Energy Limited 

  • Erection & Commissioning of MV LV Switchgear
  • Cable Laying, Termination & Testing of whole Plant
  • Erection & Commissioning of Plant Equipment’s
  • Cable Tray Works
  • Earthing System of Plant
  • Installation of Lighting System of Plant

Switchyard Erection ,testing and commissioning at 1×22 MW BAGASSE BASED CO-GENERATION PROJECT

  • Erection & Commissioning of 2 x 25/31.5 MVA, 11/132 kV Power Transformers
  • Erection & Commissioning of 10/12.5 MVA, 11 / 6.9 kV Interconnection Transformer
  • Erection & Commissioning of 2 x 15 MVA, 11 / 0.415-0.415 kV VSD Transformer
  • Erection of Switchyard Equipment including SF6, CB’s, CT’s, VT’s, Isolators etc.
  • Installation testing and commissioning of Control, metering and Protection panel
  • Indoor & outdoor Testing and Commissioning including Protection Relays
  • Cable Laying, Termination & Testing
  • Earthing
  • Installation of Telecommunication System

Fire Fighting System at 1 x 22 MW CO-GENERATION POWER PLANT Chanar

  • Basic Engineering and design Engineering of the complete fire fighting system.
  • Supply , Erection & commissioning of fire fighting system as per NFPA Standards
  • Piping Works
  • Supply , Erection & commissioning of fire Alarm system
  • Trial run & performance testing of fire fighting system
  • Obtaining statuary approval from insurance agency or fire authority of Pakistan.

Zephyr 50MW Wind Project, Gharo, Pakistan

ABB Power & Automation Pvt. Ltd. Pakistan

  • Installation testing and commissioning of 132kV GIS Substation.
  • Supply & Installation of  SERGI Based Fire Protection System

 

Zephyr 50MW Wind Project, Gharo, Pakistan

Orient Energy System 

  • Laying of Submarine & FO cables including Creek Crossing & Road Crossing
  • Installation of Fire Alarm system
  • Supply of Cable tray  & Installation of Support structure at RMU’s

Fire Fighting Projects

   Halmore Power Generation Company Limited

  • Automatic fire extinguishing system with deluge valve
  • Fire Alarm System