Completed Projects

Coca-Cola Beverages Pakistan Ltd. Faisalabad Plant

  • Structural Strengthening using Sika Material/ Strips.
  • Foundation Works of Washer, Carbo-Cooler, Filler Foundations, 40 Ton Tank Pad, RO Plant, Softening Unit, Caser & D-Caser, Ammonia Plant.
  • Tiling, GI Roofing, Tuff Pavers & Roof Treatment Works.
  • Drain Works for Processes Water, Sanitary Water, Storm Water.
  • Electrical Works

Hranmash Bulgaria

Services for Electrical & Mechanical Installations AlMaty Line at CCBPL Lahore

Engro Eximp Agri Products Muridke

  • Integrated Rice Processing Complex Project.
  • Process Area Lighting Project.
  • Main Mill Works.
  • Parboiling Plant Project.
  • Aging Ware House Project.
  • Electrical Works ESP,LP, Boiler and Auto bagging Project.

Miscellaneous

  • Colony Textile Mills 24MW.
  • Rupafil Polyester 6MW.
  • Rupali Polyester 9MW.
  • Indus Home 6MW.

Sinjhoro Development Project Sanghar

  • Installation, testing and commissioning of 3 x 965KW, 3-phase, 415 Volts, 50 Hz Gas Engine Driven Power Generators (PG-8001A, PG-8001B and PG-8001C)  complete with associated panels, Piping, Fabrication and interconnection cabling etc.
  • Synchronization, interlocking, testing and commissioning of complete power generation system.

Jamal Din Wali (JDW) Sugar Mills – Unit I

  • RCC Structures Upto + 9.0 M of Pre Juice Heater, Batch Pan, Clarifier
  • Bale Maker , Sugar Elevator, Radiator & Misc. Foundations
  • FFE Foundations & Supporting Structure up to + 22.65 M.
  • Juice Heater Structure Up to + 9.0 M

Liberty Power Tech. Ltd. Faisalabad – 200MW Combined Cycle Power Project

  • 11 DG (Wartsila W18V46) + 11 WHEGB* +1 ST.
  • 132KV  Switchyard (AIS)
  • Civil Works
    • Construction of Drain, Epoxy Painting, Water Proofing Works.
    • Road Works (Main Road to Engine Hall for 450 Ton Load).
    • Construction of Boundary Wall.
    • Weight Foundations, LPTL Store Building, Office and Guard Room.
    • Switchyard Gravel Filling & Leveling.

100MW Zorlu Bahawalpur Solar power Plant

Civil, Electrical  Erection, Testing & Commissioning for 132/11KV
Switchyard .(Partially completed)

  • Foundation Works for 132/11KV Power Transformer
  • Foundation Works for 132KV AIS CB, CT & MCT
  • Foundation Works for 132KV AIS Surge Arrestor, VT
  • Civil Works for Earthing Transformer & Earth Mast Foundation
  • Construction of Fire Protection Wall
  • Construction of 132KV Switchyard Cable Trenches
  • Provision and Placing of Trench Covers

TP -1000 Project at KE

Erection, Testing & Commissioning Works of 132/11KV Substations.

  • LANDHI  132KV Extension Works
  • Karachi Export Processing Zone (KEPZ) 132KV Extension Works
  • RECP 132KV Extension Works

Pipri Grid Station

Erection,testing and Commissioning of  250 MVA Auto Transformer at Pipri Grid Station .

  • Installation, Testing, Dehydration & Commissioning of 250MVA Auto Transformer at Pipri Grid Station
  • Sergi System Local parts (Supply & Installation)

Fire Fighting Projects

   Halmore Power Generation Company Limited

  • Automatic fire extinguishing system with deluge valve
  • Fire Alarm System