Fire Fighting System at 1 x 22 MW CO-GENERATION POWER PLANT Chanar

  • Basic Engineering and design Engineering of the complete fire fighting system.
  • Supply , Erection & commissioning of fire fighting system as per NFPA Standards
  • Piping Works
  • Supply , Erection & commissioning of fire Alarm system
  • Trial run & performance testing of fire fighting system
  • Obtaining statuary approval from insurance agency or fire authority of Pakistan.
admin

About admin