Sinjhoro Development Project Sanghar

  • Installation, testing and commissioning of 3 x 965KW, 3-phase, 415 Volts, 50 Hz Gas Engine Driven Power Generators (PG-8001A, PG-8001B and PG-8001C)  complete with associated panels, Piping, Fabrication and interconnection cabling etc.
  • Synchronization, interlocking, testing and commissioning of complete power generation system.
admin

About admin